Friday, July 22, 2011

New Work in Progress continued

In the first photo, I'm ready to put the third liner section in the top pond. The blue hose is where I will run the return from the pump. In the second photo, I have turned it on for the first time, and will spend some time checking to make sure it doesn't leak anywhere. In the third photo I have done most of the decorative rock work and put in a few plants. jc

2 comments:

  1. Lovin' it! The step-by-step is great. As always, will enjoy watching this one lush up during the blend-and-blur (blend in and blur the edges)...

    ReplyDelete
  2. It will be fun in a year to post a one year of growth picture.

    ReplyDelete